The four-story office building welcomes visitors, members, and employees of the AmperVerband company in its modern premises. The entrance area of the partially glazed facade includes inclined, V‑shaped composite steel columns spanning two floors.
Cavezzo was one of the towns in the region of Emilia-Romagna damaged by the 2012 earthquake. As a result of this event, many public and private structures were heavily damaged and became uninhabitable. The municipal gym incurred such serious damage that it was necessary to completely demolish the existing reinforced concrete structure. However, the foundation was partially left on site.
The extension of the shopping mall "Centrum Černý Most" in Prague was completed and opened in March 2013. The project was designed by architects from the British company Benoy.
From an architectural point of view, the most impressive structural component of the Černý Most shopping mall is the partially glazed roof above the food court. The featured steel structure was built for this roof.
An extraordinary project was born when the architectural office of bergmeister-wolf designed a new workshop for wood carving art in Val Gardena, South Tyrol.
As the triangulated facade could be used only partially for load application, the building represented a great challenge for the responsible timber construction engineer. But the Italian Dlubal Software customer Schrentewein & Partner mastered the task by primarily using the building's inside parts for transferring loads.